Gemini
Corus NEW
CC Moore
CARPology Rigs
Image

How to tie a Longshank Blowback Rig

Reduce your number of hook pulls with this faithful Longshank Blowback Rig with a double shrink tube kicker

1 Strip back some of the outer coating and tie a small Hair loop like so.

2 Next, thread on your chosen hooklink and secure with a bait stop.

3 Set the Hair length and secure the hook using a simple Knotless Knot.

4 Cut off three pieces of shrink tubing: one small bit and two longer ones.

5 Start off by threading the small piece down the hooklink and onto the shank.

6 Next, thread on the first kicker and shrink both bits down over a kettle.

7 With the first kicker shrunk down, add the second piece like so.

8 With the first kicker shrunk down, add the second piece like so.